The new building takes shape, October 2008, as seen from the Bent playing fields.


Work commenced early in 2008 with preparation of the site for the school extension. This photograph (March 2008) looks towards Peacock Cross, with the railway line on the left, and Cadzow Glen on the right.


By late March 2008, the steel framework takes shape.


A view from the Bent Playing Fields. Late March 2008


April 22nd 2008


April 22nd 2008


May 2008


The floor of the gymnasium is laid by June 2008


September 2008

Ground Floor Plan   First Floor Plan   Second Floor Plan   (pdf documents - large files)


Proposed new garden area at the rear of the school.

Programme for the opening of Hamilton Grammar School, 1913.   (pdf document - large file)